Skip to main content

Box 75

 Container

Contains 1 Result:

5215-1 – Texas Children’s Hospital – West Lot, South Lot – Construction Photographs, Volumes 1 and 2, 1989-1991

 File — Box: 75
Dates: 1989-1991
Scope and Contents From the Sub-Series: In the mid-1980s Texas Children’s Hospital (TCH) asked Bentsen to plan and design the large expansion of its facilities in Houston’s Texas Medical Center campus. This expansion consisted of remodeling the original TCH building (the Abercrombie Building) and construction of two new buildings on existing parking lots, called the South Lot and the West Lot. In the architectural drawings series, the West Lot building was called the Critical Care and Surgical Facility, while the South Lot...